How do we solve the problems occurred in bucket elevator?
نوشته شده توسط : sdgf

Hoist material is refers to the materials in a back to unloading position not fully discharged cake layer, and there are parts of belt dryer in the seat back to ascend conveying rate phenomenon.Portable crusher Pin shaft ends with lock nut fixed. The rotor supported on two rolling bearing. In addition, in order to make the rotor in the motion of storage certain kinetic energy, avoid crushing large materials, the speed of the hammer head too large and reduce the loss from the motor peak load, and in the end of the major axis with a flywheel.In the ascent assignments, if dou type hoist material back too much, certainly will reduce the production efficiency,Ore flotation equipment increase power consumption and material of broken rate. The reason as the following:
1, hopper run too fast hoist ascension of different material, hopper speed is different: generally improve dry powder and grain of material,Rotary dryers at around 1 ~ 2 m/s; Ascension block material, the speed of 0.4 ~ 0.Flotation machine6 m/s; Ascension wet powder and grain of material, the speed of 0.Rock crusher6 ~ 0.8 m/s. Speed is too large, unloaded in advance, cause back to the material.Drum dryer At this time of ascension shall be according to the material, properly reduce the speed of the hopper, avoid back to the material.
2,Jaw crusher supplier head of rotary drum dryer unloading tongue plate installation not appropriate, tongue plate material unloading location from hopper too far, can cause back to the material. Should be timely adjust tongue board position, avoid back to the material.
The cabinet concrete foundation laid directly, and the anchor bolts fixed. In order to facilitate maintenance, adjust and change article labyrinth, both sides of the body before and after the open a manhole. In order to facilitate maintenance, replacement hammer convenient, two side also symmetrical opened a manhole.
cone crusher and other machines are the stone crushing equipment, Mills will provide raw materials to grinding crusher useful mineral monomer separation size. Like in the cement plant, must materials will be broken, so that burn mature material, and then will clinker grinding machine with industrial spray dryer into cement. In addition, in the construction and road industry, need to use broken mechanical materials will be broken to the next request size. In the factory, sintering plant, equipment can be adjusted according, cone crusher and other machines are the sand making equipment.





:: بازدید از این مطلب : 2941
|
امتیاز مطلب : 33
|
تعداد امتیازدهندگان : 12
|
مجموع امتیاز : 12
تاریخ انتشار : چهار شنبه 29 خرداد 1392 | نظرات ()
مطالب مرتبط با این پست
لیست
می توانید دیدگاه خود را بنویسید


نام
آدرس ایمیل
وب سایت/بلاگ
:) :( ;) :D
;)) :X :? :P
:* =(( :O };-
:B /:) =DD :S
-) :-(( :-| :-))
نظر خصوصی

 کد را وارد نمایید:

آپلود عکس دلخواه: